IS WORK OVER?

Automation index

How much of a Drainlayer’s job can AI already do?

A drawing and a camera come earlier. Going down a pit and leaving it clear do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 617Scaffolder16%
  2. 618Baker16%
  3. 619Cleaner16%
  4. 621Lifeguard16%
  5. 622Tattoo artist16%
  6. 623Roofer16%