IS WORK OVER?

Automation index

How much of a Drainlayer’s job can AI already do?

A drawing and a camera come earlier. Going down a pit and leaving it clear do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Analyse my job

Jobs with similar scores

  1. 617Scaffolder16%
  2. 618Baker16%
  3. 619Cleaner16%
  4. 621Lifeguard16%
  5. 622Tattoo artist16%
  6. 623Roofer16%