IS WORK OVER?

Automation index

How much of a Dressmaker’s job can AI already do?

A block comes earlier. A dress you can dance in that does not split do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Dressmaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, cloth and the drape.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cut, make and the zip that puckers.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fitting, darts and the one that will not fit on Sunday.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Hem, lining and the shine of the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wedding, the surprise and not taking too much off.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That you can dance, and not splitting the seam.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blocks
  • drape
  • darts
  • zips
  • hem
  • dress fittings
  • line
  • party cloth

Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 605Speech therapist19%
  2. 606Luthier19%
  3. 607Workshop teacher19%
  4. 609Camp counsellor19%
  5. 610Ski instructor19%
  6. 611Furniture assembler19%