IS WORK OVER?

Automation index

How much of a Drone pilot’s job can AI already do?

A flight plan comes earlier. Lifting the drone, not losing it, and bringing the shot home do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drone pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flight plan, NOTAM, ENAIRE and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fly, frame, not lose the drone and land.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Deliver stills, video and a basic grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, batteries and the part that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, briefing and what you can actually fly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
AESA rules and liability for the flight.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fly drones
  • pilot UAS
  • flight planning
  • aerial shots
  • NOTAM
  • AESA permits
  • not lose the drone
  • grade aerial video

Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153

Control engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PID, tune and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the swing and the one that runs away.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Mode, manual and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Alarm, the interlock and not silencing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the recipe and not changing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not swing, and not leaving manual for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PID
  • tune
  • swings
  • manual mode
  • interlocks
  • recipes
  • control models
  • not silence alarms

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 342Forensic pathologist23%
  2. 343Nephrologist23%
  3. 344Pulmonologist23%
  4. 346Language teacher23%
  5. 347Radiation oncologist23%
  6. 348Rheumatologist23%