Automation index
How much of a Drone pilot’s job can AI already do?
A flight plan comes earlier. Lifting the drone, not losing it, and bringing the shot home do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Drone pilot
23%
AI can already do 23% of this job.
#345 / 743
View rankingDrone pilot
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flight plan, NOTAM, ENAIRE and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Fly, frame, not lose the drone and land.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Deliver stills, video and a basic grade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, batteries and the part that fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Client, briefing and what you can actually fly.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
AESA rules and liability for the flight.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fly drones
- pilot UAS
- flight planning
- aerial shots
- NOTAM
- AESA permits
- not lose the drone
- grade aerial video
Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145