IS WORK OVER?

Automation index

How much of a Drone pilot’s job can AI already do?

A flight plan comes earlier. Lifting the drone, not losing it, and bringing the shot home do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drone pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flight plan, NOTAM, ENAIRE and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fly, frame, not lose the drone and land.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Deliver stills, video and a basic grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, batteries and the part that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, briefing and what you can actually fly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
AESA rules and liability for the flight.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fly drones
  • pilot UAS
  • flight planning
  • aerial shots
  • NOTAM
  • AESA permits
  • not lose the drone
  • grade aerial video

Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 340Forensic pathologist23%
  2. 341Nephrologist23%
  3. 342Pulmonologist23%
  4. 344Language teacher23%
  5. 345Radiation oncologist23%
  6. 346Rheumatologist23%