IS WORK OVER?

Automation index

How much of a Drone pilot’s job can AI already do?

A flight plan comes earlier. Lifting the drone, not losing it, and bringing the shot home do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drone pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flight plan, NOTAM, ENAIRE and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fly, frame, not lose the drone and land.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Deliver stills, video and a basic grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, batteries and the part that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, briefing and what you can actually fly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
AESA rules and liability for the flight.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fly drones
  • pilot UAS
  • flight planning
  • aerial shots
  • NOTAM
  • AESA permits
  • not lose the drone
  • grade aerial video

Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153

Residential porter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shift, the sheet and the letterboxes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hall, the neighbour and the one who is not.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fault, the water and calling it in.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Move, the lift and not scratching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The residents, the complaint and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there when it floods, and not losing the master.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fault sheets
  • master key
  • the hall
  • letterboxes
  • floods
  • moves
  • the residents
  • not take sides

Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629

Analyse my job

Jobs with similar scores

  1. 333Forensic pathologist23%
  2. 334Nephrologist23%
  3. 335Pulmonologist23%
  4. 337Language teacher23%
  5. 338Radiation oncologist23%
  6. 339Rheumatologist23%