IS WORK OVER?

Automation index

How much of a Drone pilot’s job can AI already do?

A flight plan comes earlier. Lifting the drone, not losing it, and bringing the shot home do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drone pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flight plan, NOTAM, ENAIRE and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Fly, frame, not lose the drone and land.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Deliver stills, video and a basic grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, batteries and the part that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, briefing and what you can actually fly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
AESA rules and liability for the flight.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fly drones
  • pilot UAS
  • flight planning
  • aerial shots
  • NOTAM
  • AESA permits
  • not lose the drone
  • grade aerial video

Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Analyse my job

Jobs with similar scores

  1. 306Forensic pathologist23%
  2. 307Nephrologist23%
  3. 308Pulmonologist23%
  4. 310Language teacher23%
  5. 311Radiation oncologist23%
  6. 312Rheumatologist23%