Automation index
How much of a Drone pilot’s job can AI already do?
A flight plan comes earlier. Lifting the drone, not losing it, and bringing the shot home do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Drone pilot
23%
AI can already do 23% of this job.
#309 / 633
View rankingDrone pilot
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flight plan, NOTAM, ENAIRE and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Fly, frame, not lose the drone and land.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Deliver stills, video and a basic grade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, batteries and the part that fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Client, briefing and what you can actually fly.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
AESA rules and liability for the flight.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fly drones
- pilot UAS
- flight planning
- aerial shots
- NOTAM
- AESA permits
- not lose the drone
- grade aerial video
Sources for this job· O*NET 53-2012.00· ESCO/ISCO 3153
IS WORK OVER?
Well driller
19%
#534 / 633
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113