Automation index
How much of a Dry cleaner’s job can AI already do?
A stain card comes earlier. Lifting the stain without eating the colour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dry cleaner
22%
AI can already do 22% of this job.
#419 / 733
View rankingDry cleaner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Card, fibre and pretreatment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Machine, solvent and the delicate garment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Press, the finish and the one that marks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Job, the groom and the one who wants it now.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The old stain and not promising miracles.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Lift the stain, and not eating the colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pretreat stains
- solvents
- press
- delicates
- job cards
- finish
- fibres
- old stains
Sources for this job· O*NET 51-6011.00· ESCO/ISCO 9121
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142