Automation index
How much of a Dyer’s job can AI already do?
A bath recipe comes earlier. The colour as ordered without bleeding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dyer
22%
AI can already do 22% of this job.
#398 / 633
View rankingDyer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, bath and the sample.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dye, stir and the one that takes uneven.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rinse, fix and the fastness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Job, the garment and the fibre they did not mention.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the black and not bleeding on the shirt.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The colour as ordered, and not bleeding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bath recipes
- dye garments
- fastness
- fix colour
- samples
- fibres
- rinse
- bleeding
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Building surveyor
22%
#321 / 633
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112