Automation index
How much of a Dyer’s job can AI already do?
A bath recipe comes earlier. The colour as ordered without bleeding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dyer
22%
AI can already do 22% of this job.
#398 / 633
View rankingDyer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, bath and the sample.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dye, stir and the one that takes uneven.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rinse, fix and the fastness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Job, the garment and the fibre they did not mention.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the black and not bleeding on the shirt.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The colour as ordered, and not bleeding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bath recipes
- dye garments
- fastness
- fix colour
- samples
- fibres
- rinse
- bleeding
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Electronics engineer
25%
#237 / 633
View rankingElectronics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematic, simulation and PCB layout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Firmware, tests and bench.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Vendors, prototypes and certifications.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Debug EMC and field faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versioning and quality.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not sending a blind board to manufacture.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematic, simulation and PCB layout
- Firmware, tests and bench
- Vendors, prototypes and certifications
- Debug EMC and field faults
- Documentation, versioning and quality
- Not sending a blind board to manufacture
- ingeniero electronico
- electronics engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152