Automation index
How much of a Dyer’s job can AI already do?
A bath recipe comes earlier. The colour as ordered without bleeding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dyer
22%
AI can already do 22% of this job.
#407 / 643
View rankingDyer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, bath and the sample.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dye, stir and the one that takes uneven.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rinse, fix and the fastness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Job, the garment and the fibre they did not mention.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the black and not bleeding on the shirt.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The colour as ordered, and not bleeding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bath recipes
- dye garments
- fastness
- fix colour
- samples
- fibres
- rinse
- bleeding
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Industrial engineer
28%
#102 / 643
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141