Automation index
How much of a Dyer’s job can AI already do?
A bath recipe comes earlier. The colour as ordered without bleeding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dyer
22%
AI can already do 22% of this job.
#398 / 633
View rankingDyer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipe, bath and the sample.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dye, stir and the one that takes uneven.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rinse, fix and the fastness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Job, the garment and the fibre they did not mention.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the black and not bleeding on the shirt.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The colour as ordered, and not bleeding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bath recipes
- dye garments
- fastness
- fix colour
- samples
- fibres
- rinse
- bleeding
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112