Automation index
How much of a Education specialist’s job can AI already do?
A curriculum design and a report come earlier. Actually changing a school does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Education specialist
25%
AI can already do 25% of this job.
#287 / 753
View rankingEducation specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design schemes, rubrics and assessments.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Reports, diagnoses and school plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Train staff and accompany teams.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Observe class and feed back with care.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Families, inspectorate and EU projects.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not selling pedagogical fashion without a classroom.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design schemes, rubrics and assessments
- Reports, diagnoses and school plans
- Train staff and accompany teams
- Observe class and feed back with care
- Families, inspectorate and EU projects
- pedagogo
- pedagoga
- education specialist
Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145