IS WORK OVER?

Automation index

How much of a Education specialist’s job can AI already do?

A curriculum design and a report come earlier. Actually changing a school does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Education specialist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design schemes, rubrics and assessments.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Reports, diagnoses and school plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Train staff and accompany teams.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Observe class and feed back with care.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Families, inspectorate and EU projects.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not selling pedagogical fashion without a classroom.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design schemes, rubrics and assessments
  • Reports, diagnoses and school plans
  • Train staff and accompany teams
  • Observe class and feed back with care
  • Families, inspectorate and EU projects
  • pedagogo
  • pedagoga
  • education specialist

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 284Auto mechanic25%
  2. 285Meteorologist25%
  3. 286Motion designer25%
  4. 288Political scientist25%
  5. 289Court procurator25%
  6. 290Scrum master25%