IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Adult literacy tutor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Level, the sheet and the one who did not come.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reading, the contract and the small print.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Writing, the form and not doing it for them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Group, the shame and not exposing them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the grant and not inflating attendance.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they read the contract, and not being ashamed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • syllables
  • reading contracts
  • forms
  • literacy groups
  • shame
  • small print
  • attendance
  • not expose

Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2359

Analyse my job

Jobs with similar scores

  1. 249Production engineer25%
  2. 250Robotics engineer25%
  3. 251Telecom engineer25%
  4. 253Electronics engineer25%
  5. 254Geological engineer25%
  6. 255Mechanical engineer25%