IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Cloud engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Terraform, the state and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Account, the limit and the one that spikes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bucket, the public one and closing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Network, the jump and not leaving SSH open to the world.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
FinOps, the bill and not hiding the waste.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not fall over, and not leaving the bucket public.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Terraform
  • state
  • buckets
  • cloud accounts
  • SSH
  • bills
  • modules
  • not leave public

Sources for this job· O*NET 15-1241.00· ESCO/ISCO 2523

Analyse my job

Jobs with similar scores

  1. 279Production engineer25%
  2. 280Robotics engineer25%
  3. 281Telecom engineer25%
  4. 283Electronics engineer25%
  5. 284Geological engineer25%
  6. 285Mechanical engineer25%