Automation index
How much of a Electrical engineer’s job can AI already do?
A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Electrical engineer
25%
AI can already do 25% of this job.
#236 / 633
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151
IS WORK OVER?
Factory operator
24%
#276 / 633
View rankingFactory operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, SOPs and quality records.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 38% | +6.1 |
Read orders and line screens.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 32% | +4.5 |
Feed, run and unjam the line.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 18% | +4 |
Changeover and tool cleaning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
In-station quality and stopping a defect.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Shifts, safety and coworkers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, SOPs and quality records
- Read orders and line screens
- Feed, run and unjam the line
- Changeover and tool cleaning
- In-station quality and stopping a defect
- Shifts, safety and coworkers
- operario de fabrica
- factory operator
- linea de produccion
Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211