IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Farrier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hoof, balance and the animal’s card.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Trim, nail and the one that will not stand.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Forge, the made shoe and the trim.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Lameness, the vet and not blaming the shoe.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The yard, the owner and the one who does not pay.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not lame, and not over-nailing.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • shoe horses
  • balance
  • trim hooves
  • made shoes
  • lameness
  • the forge
  • yards
  • nail

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6121

Analyse my job

Jobs with similar scores

  1. 233Production engineer25%
  2. 234Robotics engineer25%
  3. 235Telecom engineer25%
  4. 237Electronics engineer25%
  5. 238Geological engineer25%
  6. 239Mechanical engineer25%