IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Fire investigator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Scene, the origin and not treading it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cause, the short and the rag.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sample, the lab and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the insurer and not selling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The judge, the hearing and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Call the cause, and not selling it to the insurer.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fire origin
  • shorts
  • rags
  • samples
  • expert reports
  • insurers
  • the scene
  • not tread

Sources for this job· O*NET 33-2021.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 264Production engineer25%
  2. 265Robotics engineer25%
  3. 266Telecom engineer25%
  4. 268Electronics engineer25%
  5. 269Geological engineer25%
  6. 270Mechanical engineer25%