IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

In-house counsel

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Contract, clauses and the risk.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Sales, the close and not yielding the essential.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Dispute, the procurator and not sleeping the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Board, the memo and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The CEO, the rush and not signing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Say no, and not leaving the company sold.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • commercial contracts
  • clauses
  • legal risk
  • the board
  • procedural deadlines
  • sales
  • not sign blind
  • legal memos

Sources for this job· O*NET 23-1011.00· ESCO/ISCO 2611

Analyse my job

Jobs with similar scores

  1. 257Production engineer25%
  2. 258Robotics engineer25%
  3. 259Telecom engineer25%
  4. 261Electronics engineer25%
  5. 262Geological engineer25%
  6. 263Mechanical engineer25%