IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Instructional designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Aim, the storyboard and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot, the learner and what is not understood.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Activity, the feedback and not putting a silly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
LMS, the figure and not inflating completion.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the deadline and not cutting the practice.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That they learn, and not leaving the empty video.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • course storyboard
  • modules
  • learner pilot
  • activities
  • LMS
  • completion
  • feedback
  • not a silly test

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 257Production engineer25%
  2. 258Robotics engineer25%
  3. 259Telecom engineer25%
  4. 261Electronics engineer25%
  5. 262Geological engineer25%
  6. 263Mechanical engineer25%