IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Neuropsychologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Battery, norms and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Patient, the fatigue and the one who quits the test.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Imaging, the lobe and not forcing the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rehab, the aim and what still can.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The family, the report and not scaring.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Say what is left, and not selling an extra diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neuropsych batteries
  • test norms
  • cognitive rehab
  • neuropsych reports
  • test fatigue
  • lobes
  • the family
  • not scare

Sources for this job· O*NET 19-3039.00· ESCO/ISCO 2634

Analyse my job

Jobs with similar scores

  1. 239Production engineer25%
  2. 240Robotics engineer25%
  3. 241Telecom engineer25%
  4. 243Electronics engineer25%
  5. 244Geological engineer25%
  6. 245Mechanical engineer25%