IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Pharmacovigilance officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Case, the file and MedDRA.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Seriousness, the link and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
File, the AEMPS deadline and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Signal, the aggregate and not playing it down.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The doctor, the ADR and not arguing the story.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
If it is serious, call it. And not staying quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ADR
  • MedDRA
  • AEMPS
  • safety signals
  • seriousness
  • causality
  • case files
  • regulatory deadlines

Sources for this job· O*NET 29-1051.00· ESCO/ISCO 2262

Analyse my job

Jobs with similar scores

  1. 238Production engineer25%
  2. 239Robotics engineer25%
  3. 240Telecom engineer25%
  4. 242Electronics engineer25%
  5. 243Geological engineer25%
  6. 244Mechanical engineer25%