IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 272Production engineer25%
  2. 273Robotics engineer25%
  3. 274Telecom engineer25%
  4. 276Electronics engineer25%
  5. 277Geological engineer25%
  6. 278Mechanical engineer25%