IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Tax officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Match, the return and the gap.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Notice, the deadline and the one who will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Minute, the facts and not stretching them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Garnishment, proportion and not sinking extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The boss, the target and not hunting for sport.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Assess what is there, and not inventing the crime.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • data matches
  • tax returns
  • notices
  • minutes
  • garnishments
  • facts
  • tax-office deadlines
  • not stretch facts

Sources for this job· O*NET 13-2081.00· ESCO/ISCO 3352

Analyse my job

Jobs with similar scores

  1. 260Production engineer25%
  2. 261Robotics engineer25%
  3. 262Telecom engineer25%
  4. 264Electronics engineer25%
  5. 265Geological engineer25%
  6. 266Mechanical engineer25%