IS WORK OVER?

Automation index

How much of a Electrical engineer’s job can AI already do?

A schematic and a cable-size calc come earlier. Energising a board and not burning anything do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electrical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, single-line diagram and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Project, quantities and electrical spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Site, contractors and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Measurements, thermography and faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Code, quality and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign and own the installation.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wiring
  • electrical panels
  • repair faults
  • Project, quantities and electrical spec
  • Site, contractors and commissioning
  • Measurements, thermography and faults
  • Code, quality and documentation
  • Sign and own the installation
  • ingeniero electrico

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Weaver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Warp, weave and the width.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Weave, shuttle and the yarn that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Finish, fringe and the shrink.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Loom, the rhythm and the commissioned piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the colour and not changing the warp halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without breaking the pick, and a clean weave.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • warp
  • weaves
  • shuttle
  • looms
  • fringe
  • the pick
  • cloth width
  • shrink

Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318

Analyse my job

Jobs with similar scores

  1. 233Production engineer25%
  2. 234Robotics engineer25%
  3. 235Telecom engineer25%
  4. 237Electronics engineer25%
  5. 238Geological engineer25%
  6. 239Mechanical engineer25%