Automation index
How much of a Electrician’s job can AI already do?
Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Electrician
24%↑
AI can already do 24% of this job.
#265 / 633
View rankingElectrician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Use a variety of tools or equipment, such as power construction equipment, measuring devices, power tools, and testing equipment, such as oscilloscopes, ammeters, or test lamps.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Work from ladders, scaffolds, or roofs to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 12% | +1.2 |
Prepare sketches or follow blueprints to determine the location of wiring or equipment and to ensure conformance to building and safety codes.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble, install, test, or maintain electrical or electronic wiring, equipment, appliances, apparatus, or fixtures, using hand tools or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Place conduit, pipes, or tubing, inside designated partitions, walls, or other concealed areas, and pull insulated wires or cables through the conduit to complete circuits between boxes.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Direct or train workers to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Inspect electrical systems, equipment, or components to identify hazards, defects, or the need for adjustment or repair, and to ensure compliance with codes.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Perform physically demanding tasks, such as digging trenches to lay conduit or moving or lifting heavy objects.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 40% | 28% | +11.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- building systems monitoring technology
- electricity
- work ergonomically
- resolve equipment malfunctions
- inspect electrical supplies
- splice cable
- inspect construction supplies
Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411
IS WORK OVER?
Data architect
28%
#83 / 633
View rankingData architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Models, lineage and the catalogue.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Pipelines, quality and the data contract.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The analyst who finds nothing and the mess.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Privacy, retention and the field you cannot keep.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The business, shadow IT and not building another lake.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it gets used, and not letting raw data rot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model data
- lineage
- data catalogue
- data contracts
- pipeline quality
- retention
- data lakes
- privacy
Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511