IS WORK OVER?

Automation index

How much of a Electronics engineer’s job can AI already do?

A schematic and a layout come earlier. A board that works first time does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Electoral officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roll, additions and the one who is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Station, the chair and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Polling day, the incident and the one who protests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Count, the minute and not jumping a result.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The board, the complaint and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the right one votes, and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • electoral roll
  • stations
  • ballot boxes
  • the count
  • minutes
  • incidents
  • polling day
  • roll additions

Sources for this job· O*NET 13-1199.00· ESCO/ISCO 3359

Analyse my job

Jobs with similar scores

  1. 265Robotics engineer25%
  2. 266Telecom engineer25%
  3. 267Electrical engineer25%
  4. 269Geological engineer25%
  5. 270Mechanical engineer25%
  6. 271Naval architect25%