IS WORK OVER?

Automation index

How much of a Electronics engineer’s job can AI already do?

A schematic and a layout come earlier. A board that works first time does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Route planner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Optimise, windows and capacity.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Restrictions, tolls and the right vehicle.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The salesperson who promises and the plan that will not.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Recalc, incidents and the next day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The warehouse, the cut-off and not leaving the last one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it fits, and not blowing the hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • optimise routes
  • delivery windows
  • tolls
  • vehicle capacity
  • recalc
  • traffic restrictions
  • warehouse cut-off
  • driving hours

Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323

Analyse my job

Jobs with similar scores

  1. 234Robotics engineer25%
  2. 235Telecom engineer25%
  3. 236Electrical engineer25%
  4. 238Geological engineer25%
  5. 239Mechanical engineer25%
  6. 240Naval architect25%