IS WORK OVER?

Automation index

How much of a Electronics engineer’s job can AI already do?

A schematic and a layout come earlier. A board that works first time does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Scrum master

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Facilitate ceremonies, boards and notes.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Flow metrics and impediment reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Team coaching and internal conflict.
Estimate

No public source provides a precise figure. This is our estimate.

18%15%+2.7
Protect the sprint from interruptions.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Train PO and managers in the method.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Change the system, not just the ritual.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Facilitate ceremonies, boards and notes
  • Flow metrics and impediment reports
  • Team coaching and internal conflict
  • Protect the sprint from interruptions
  • Train PO and managers in the method
  • Change the system, not just the ritual
  • scrum master
  • agile coach

Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421

Analyse my job

Jobs with similar scores

  1. 234Robotics engineer25%
  2. 235Telecom engineer25%
  3. 236Electrical engineer25%
  4. 238Geological engineer25%
  5. 239Mechanical engineer25%
  6. 240Naval architect25%