Automation index
How much of a Embroiderer’s job can AI already do?
A pricked drawing comes earlier. Thread that tells without pulling the cloth do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Embroiderer
19%
AI can already do 19% of this job.
#490 / 643
View rankingEmbroiderer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drawing, hoop and thread colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, raised work and the one that tangles.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Machine, program and the one that eats the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the back and not leaving knots.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The garment, the deadline and not changing the drawing halfway.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the thread tells, and not pulling the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hoop
- raised work
- stitches
- threads
- the back
- machine programs
- pricked drawings
- knots
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Actuary
32%
#25 / 643
View rankingActuary
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run models, reserves and sensitivities.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 55% | +13.2 |
Draft technical reports and memos.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Choose assumptions, tables and criteria.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Explain to the board and the supervisor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Validate data quality and bias.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Signed opinion and professional liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 18% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Run models, reserves and sensitivities
- Draft technical reports and memos
- Choose assumptions, tables and criteria
- Explain to the board and the supervisor
- Validate data quality and bias
- Signed opinion and professional liability
- actuario
- actuary
Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120