IS WORK OVER?

Automation index

How much of a Embroiderer’s job can AI already do?

A pricked drawing comes earlier. Thread that tells without pulling the cloth do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Embroiderer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, hoop and thread colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, raised work and the one that tangles.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Machine, program and the one that eats the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the back and not leaving knots.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The garment, the deadline and not changing the drawing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the thread tells, and not pulling the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hoop
  • raised work
  • stitches
  • threads
  • the back
  • machine programs
  • pricked drawings
  • knots

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533

Air traffic controller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan sequences and read traffic forecasts.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Strips, tickets and inter-unit coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tactical control of aircraft on frequency.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Resolve conflicts, radio failures and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Train and supervise a controller under instruction.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Reports, incidents and shift fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Plan sequences and read traffic forecasts
  • Tactical control of aircraft on frequency
  • Reports, incidents and shift fatigue
  • controlador aereo
  • air traffic
  • atc
  • torre de control

Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154

Analyse my job

Jobs with similar scores

  1. 487Grill cook19%
  2. 488Props master19%
  3. 489Dental assistant19%
  4. 491Bellhop19%
  5. 492Ship captain19%
  6. 493Ceramicist19%