IS WORK OVER?

Automation index

How much of a Embroiderer’s job can AI already do?

A pricked drawing comes earlier. Thread that tells without pulling the cloth do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Embroiderer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, hoop and thread colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, raised work and the one that tangles.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Machine, program and the one that eats the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the back and not leaving knots.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The garment, the deadline and not changing the drawing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the thread tells, and not pulling the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hoop
  • raised work
  • stitches
  • threads
  • the back
  • machine programs
  • pricked drawings
  • knots

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533

Firmware engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Image, the signature and the slot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Flash, the batch and the one that bricks.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Rollback, the test and not skipping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Boot, the brick and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The factory, the cadence and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Flash without bricking, and not skipping rollback.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • firmware images
  • digital signature
  • slots
  • flash
  • rollback
  • boot
  • factory batches
  • not brick

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 596SEN teaching assistant19%
  2. 597Geriatric aide19%
  3. 598Dental assistant19%
  4. 600Bellhop19%
  5. 601Ship captain19%
  6. 602Ceramicist19%