Automation index
How much of a Embroiderer’s job can AI already do?
A pricked drawing comes earlier. Thread that tells without pulling the cloth do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Embroiderer
19%
AI can already do 19% of this job.
#481 / 633
View rankingEmbroiderer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drawing, hoop and thread colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, raised work and the one that tangles.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Machine, program and the one that eats the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the back and not leaving knots.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The garment, the deadline and not changing the drawing halfway.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the thread tells, and not pulling the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hoop
- raised work
- stitches
- threads
- the back
- machine programs
- pricked drawings
- knots
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Robotics engineer
25%
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149