IS WORK OVER?

Automation index

How much of a Embroiderer’s job can AI already do?

A pricked drawing comes earlier. Thread that tells without pulling the cloth do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Embroiderer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, hoop and thread colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, raised work and the one that tangles.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Machine, program and the one that eats the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the back and not leaving knots.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The garment, the deadline and not changing the drawing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the thread tells, and not pulling the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hoop
  • raised work
  • stitches
  • threads
  • the back
  • machine programs
  • pricked drawings
  • knots

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Analyse my job

Jobs with similar scores

  1. 478Grill cook19%
  2. 479Props master19%
  3. 480Dental assistant19%
  4. 482Bellhop19%
  5. 483Ship captain19%
  6. 484Ceramicist19%