Automation index
How much of a Embroiderer’s job can AI already do?
A pricked drawing comes earlier. Thread that tells without pulling the cloth do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Embroiderer
19%
AI can already do 19% of this job.
#490 / 643
View rankingEmbroiderer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drawing, hoop and thread colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, raised work and the one that tangles.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Machine, program and the one that eats the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the back and not leaving knots.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The garment, the deadline and not changing the drawing halfway.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the thread tells, and not pulling the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hoop
- raised work
- stitches
- threads
- the back
- machine programs
- pricked drawings
- knots
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412