Automation index
How much of a Embryologist’s job can AI already do?
A time-lapse comes earlier. Picking the embryo without mixing the file do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Embryologist
19%
AI can already do 19% of this job.
#503 / 643
View rankingEmbryologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Retrieval, oocytes and the culture.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
ICSI, the sperm and the one that will not fertilise.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Time-lapse, the grade and picking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Transfer, the catheter and not losing the embryo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The file, the double check and not mixing couples.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Pick it, and not mixing the file.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- oocytes
- ICSI
- embryo culture
- time-lapse
- transfer
- double check
- egg retrieval
- embryo grade
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 2131
IS WORK OVER?
Civil engineer
25%
#236 / 643
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142