IS WORK OVER?

Automation index

How much of a Embryologist’s job can AI already do?

A time-lapse comes earlier. Picking the embryo without mixing the file do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Embryologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Retrieval, oocytes and the culture.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICSI, the sperm and the one that will not fertilise.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Time-lapse, the grade and picking.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Transfer, the catheter and not losing the embryo.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The file, the double check and not mixing couples.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Pick it, and not mixing the file.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • oocytes
  • ICSI
  • embryo culture
  • time-lapse
  • transfer
  • double check
  • egg retrieval
  • embryo grade

Sources for this job· O*NET 29-2011.00· ESCO/ISCO 2131

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 500Film director19%
  2. 501Gilder19%
  3. 502Cabinetmaker19%
  4. 504Swimming coach19%
  5. 505Tennis coach19%
  6. 506Stucco artist19%