Automation index
How much of a Embryologist’s job can AI already do?
A time-lapse comes earlier. Picking the embryo without mixing the file do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Embryologist
19%
AI can already do 19% of this job.
#503 / 643
View rankingEmbryologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Retrieval, oocytes and the culture.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
ICSI, the sperm and the one that will not fertilise.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Time-lapse, the grade and picking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Transfer, the catheter and not losing the embryo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The file, the double check and not mixing couples.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Pick it, and not mixing the file.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- oocytes
- ICSI
- embryo culture
- time-lapse
- transfer
- double check
- egg retrieval
- embryo grade
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 2131
IS WORK OVER?
Hydraulic engineer
27%
#166 / 643
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142