IS WORK OVER?

Automation index

How much of a Embryologist’s job can AI already do?

A time-lapse comes earlier. Picking the embryo without mixing the file do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Embryologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Retrieval, oocytes and the culture.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICSI, the sperm and the one that will not fertilise.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Time-lapse, the grade and picking.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Transfer, the catheter and not losing the embryo.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The file, the double check and not mixing couples.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Pick it, and not mixing the file.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • oocytes
  • ICSI
  • embryo culture
  • time-lapse
  • transfer
  • double check
  • egg retrieval
  • embryo grade

Sources for this job· O*NET 29-2011.00· ESCO/ISCO 2131

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 500Film director19%
  2. 501Gilder19%
  3. 502Cabinetmaker19%
  4. 504Swimming coach19%
  5. 505Tennis coach19%
  6. 506Stucco artist19%