Automation index
How much of a Emergency physician’s job can AI already do?
Triage and a protocol come earlier. Deciding in five minutes and telling the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Emergency physician
20%
AI can already do 20% of this job.
#535 / 733
View rankingEmergency physician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read vitals, ECG and shock protocols.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Assess, stabilise and prioritise beds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Procedures: line, suture, CPR.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Brief family and negotiate doubtful discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, consults and ward admissions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, team and not leaving anyone in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- Read vitals, ECG and shock protocols
- Assess, stabilise and prioritise beds
- Procedures: line, suture, CPR
- Notes, consults and ward admissions
- medico de urgencias
- urgentologo
Sources for this job· O*NET 29-1214.00· ESCO/ISCO 2212
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142