IS WORK OVER?

Automation index

How much of a Emergency physician’s job can AI already do?

Triage and a protocol come earlier. Deciding in five minutes and telling the family do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Emergency physician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read vitals, ECG and shock protocols.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assess, stabilise and prioritise beds.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Procedures: line, suture, CPR.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Brief family and negotiate doubtful discharges.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Notes, consults and ward admissions.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shift, team and not leaving anyone in the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • care for patients
  • diagnose
  • nursing care
  • clinical notes
  • Read vitals, ECG and shock protocols
  • Assess, stabilise and prioritise beds
  • Procedures: line, suture, CPR
  • Notes, consults and ward admissions
  • medico de urgencias
  • urgentologo

Sources for this job· O*NET 29-1214.00· ESCO/ISCO 2212

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 453Window dresser20%
  2. 454Dental hygienist20%
  3. 455Intensivist20%
  4. 457Cycle courier20%
  5. 458Kitchen fitter20%
  6. 459Neonatologist20%