Automation index
How much of a Emergency physician’s job can AI already do?
Triage and a protocol come earlier. Deciding in five minutes and telling the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Emergency physician
20%
AI can already do 20% of this job.
#535 / 733
View rankingEmergency physician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read vitals, ECG and shock protocols.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Assess, stabilise and prioritise beds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Procedures: line, suture, CPR.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Brief family and negotiate doubtful discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, consults and ward admissions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, team and not leaving anyone in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- Read vitals, ECG and shock protocols
- Assess, stabilise and prioritise beds
- Procedures: line, suture, CPR
- Notes, consults and ward admissions
- medico de urgencias
- urgentologo
Sources for this job· O*NET 29-1214.00· ESCO/ISCO 2212
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142