Automation index
How much of a Emergency physician’s job can AI already do?
Triage and a protocol come earlier. Deciding in five minutes and telling the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Emergency physician
20%
AI can already do 20% of this job.
#551 / 753
View rankingEmergency physician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read vitals, ECG and shock protocols.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Assess, stabilise and prioritise beds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Procedures: line, suture, CPR.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Brief family and negotiate doubtful discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, consults and ward admissions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shift, team and not leaving anyone in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- Read vitals, ECG and shock protocols
- Assess, stabilise and prioritise beds
- Procedures: line, suture, CPR
- Notes, consults and ward admissions
- medico de urgencias
- urgentologo
Sources for this job· O*NET 29-1214.00· ESCO/ISCO 2212
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113