IS WORK OVER?

Automation index

How much of a Energy engineer’s job can AI already do?

A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Butcher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Slaughterhouse orders, traceability and labels.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Break down, bone and prep.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Counter, custom cuts and advice.
Estimate

No public source provides a precise figure. This is our estimate.

18%10%+1.8
Till, offers and waste.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hygiene, cold room and sharpening.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Prepared: burger, marinade, sausage.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Break down, bone and prep
  • Counter, custom cuts and advice
  • Till, offers and waste
  • Hygiene, cold room and sharpening
  • Prepared: burger, marinade, sausage
  • carnicer
  • butcher
  • despiece

Sources for this job· O*NET 51-3021.00· ESCO/ISCO 7511

Analyse my job

Jobs with similar scores

  1. 157Printing press operator27%
  2. 158Food engineer27%
  3. 159Automation engineer27%
  4. 161Packaging engineer27%
  5. 162Materials engineer27%
  6. 163Renewables engineer27%