Automation index
How much of a Energy engineer’s job can AI already do?
A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Energy engineer
27%
AI can already do 27% of this job.
#160 / 623
View rankingEnergy engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Energy audit, curves and the saving potential.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Contracts, tariffs and the power market.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Plant, meters and what the meter misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Efficiency projects and the real payback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The board, the CAPEX and the no to the project.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Save for real, and not selling green smoke.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- energy audit
- load curves
- power tariffs
- energy efficiency
- CAPEX payback
- plant metering
- power market
- real savings
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Chemist
26%
#209 / 623
View rankingChemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, calcs and safety sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Batch reports, charts and docs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Synthesis, titration and sample handling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Read a strange result and repeat it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plant safety and waste.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Sign quality and talk to production.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, calcs and safety sheets
- Batch reports, charts and docs
- Synthesis, titration and sample handling
- Read a strange result and repeat it
- Plant safety and waste
- Sign quality and talk to production
- quimico
- chemist
- laboratorio quimico
Sources for this job· O*NET 19-2031.00· ESCO/ISCO 2113