IS WORK OVER?

Automation index

How much of a Energy engineer’s job can AI already do?

A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Coast guard

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shout, the position and the boat.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sea, the one who is drowning and the storm.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Inspection, the trawler and the one that runs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Night, the radar and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The station, the note and not dressing the shortfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the one who is drowning, and not losing the boat.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boats
  • shouts
  • drowning
  • trawlers
  • radar
  • the storm
  • inspections at sea
  • station notes

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411

Analyse my job

Jobs with similar scores

  1. 169Printing press operator27%
  2. 170Food engineer27%
  3. 171Automation engineer27%
  4. 173Packaging engineer27%
  5. 174Materials engineer27%
  6. 175Renewables engineer27%