Automation index
How much of a Energy engineer’s job can AI already do?
A load curve comes earlier. Cutting the bill without leaving the process in the dark do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Energy engineer
27%
AI can already do 27% of this job.
#160 / 633
View rankingEnergy engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Energy audit, curves and the saving potential.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Contracts, tariffs and the power market.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Plant, meters and what the meter misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Efficiency projects and the real payback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The board, the CAPEX and the no to the project.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Save for real, and not selling green smoke.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- energy audit
- load curves
- power tariffs
- energy efficiency
- CAPEX payback
- plant metering
- power market
- real savings
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Driving examiner
21%
#417 / 633
View rankingDriving examiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, card and the day’s draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The test, the serious fault and the one who panics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pass or not, the report and not arguing hot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Driving school, the car and the instructor on the kerb.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, traffic and the same standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A fair pass, and not giving the licence away.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test routes
- serious faults
- driving pass
- test reports
- one standard
- driving schools
- candidate nerves
- the licence
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 3359